Well this week is finally over. to show the multitude of tasks i have to know in my lone of work, i will give a rundown of the jobs i did this week.
Monday - Remodeled a kitchen...take down all old cabinets, remove all fixtures off walls, repair walls as needed, locate studs in walls, hangs wall cabinets, and trim work, set base cabinets and trim work, hook up the plumbing for the sink and sprayer, dishwasher, ice maker, and garbage disposal.
Tuesday - Replace 7 upstairs windows... remove all window trim, remove all old window and hardware, remove any unneeded jamb material, remove storm window, insert new window, plum and level window in opening, screw window to jamb, insulate around entire window, replace moldings as needed, caulk as needed, get ladder from truck, working from ladder, insulate front of new window, add trim as needed, caulk as needed.
Wednesday - replace 9 downstairs windows...same as above but a little easier as ladder USUALLY isn't needed, especially by me.
Thursday - replace entire plumbing system for drains in entire remodeled house (3 bath, 4 bedroom, kitchen, laundry room, in three story house). finished almost all the drain lines, will finish tomorrow (Friday)
Friday - finish drain line plumbing and start supply lines for water, connected all gas lines for furnace, and water heater, got furnace running ( thank goodness for that, as it is COLD COLD COLD out right now)
Saturday - I will be replacing 3 windows at 2 different houses, install 2 storm doors, then go to my Boss's house to try to finish sanding his Sheetrock on his addition.
cant wait till vacation, 6 work days a week are long and tiring. need rest. speaking of which...I'm off to bed now. Have a great week and talk to you all again soon.